What Is Jev — Part 2: How You Build With It

Part 1 cast Jev as a typed decision engine. Building rarely means retraining. It means designing the question contract, feeding unstructured state at runtime, and branching code on calibrated probabilities.

Wiring order

1. Stage 01 — Decision points

Walk the workflow and mark places humans already choose with a stable rubric. Closed sets are Jev candidates; open-ended wording stays with an LLM.

2. Stage 02 — Schema

For Choice, lock product-language labels. For Score, define what each level means in ops. For Noul, write a sharp proposition. The schema is the API.

3. Stage 03 — State and call

Inputs stay unstructured. Calls are typically tens to hundreds of milliseconds — easy to place as guardrails next to slower LLM hops. Outputs need no HTML scraping.

4. Stage 04 — Thresholds

Low top Choice probability → human queue. High Noul → auto-block. Wide Score distribution → mark ambiguous. Dropping probabilities wastes what System One is for.

LLM and Jev are layers, not rivals. The LLM drafts; Jev closes send / where / how much.

Once wired, the remaining question is fit. Part 3 maps good applications and antipatterns.